Cut · Fill · Level · Compact

Site Prep for Slabs, Driveways & Sheds in Arlington, TX

Concrete cracks and sheds lean when the ground under them wasn't prepared. We dig out, fill, level and compact so your slab, driveway or building sits on solid ground.

What We Prepare

How We Do It

  1. Mark the footprint and check the slope so the finished pad drains away from the house.
  2. Strip grass and topsoil, then cut high spots and fill low spots.
  3. Add base material, such as crushed stone or select fill, where needed.
  4. Compact in layers with a plate compactor or roller.
  5. Check level, haul off the extra soil and leave it ready for your concrete crew or builder.

What It Typically Costs

JobTypical starting price
Shed pad with gravel base (about 10×12)about $900–$1,800
Driveway base prepabout $1,500 and up
Old driveway or patio removalabout $1,200 and up

Typical Arlington-area starting points. Size, how much soil moves, base thickness and access change the price. See the price guide.

Working With Your Concrete Contractor

We prepare the ground. If you already have a concrete or shed company, we'll prep to their depth and base specs. If you need one, ask us at the estimate.

Questions

Site Prep FAQ

How thick should the base be under a shed or slab?

Most residential pads use about 4 to 6 inches of compacted crushed stone or select fill. Driveways and heavier loads often need more. Follow your builder's or engineer's specs where they apply.

Can you remove my old driveway too?

Yes. Old concrete or asphalt is broken out and hauled off, then the base is regraded and compacted for the new one.

How long does site prep take?

Most shed and patio pads take a day. Driveways and larger pads take one to three days.